Inspections Guide

Inspection Items

  • A preconstruction meeting is required before any work is done on a window replacement.  At this meeting the inspector will verify the existing condition versus the approved plan, and instruct accordingly.
  • A rough inspection is then required. It is important to not cover any pertinent areas until the inspector has seen and approved the work.

Window Requirements

  • It is important to adhere to emergency egress requirements.
  • Current energy requirements of U-Factor of 0.67 and SHGC OF 0.40 must be observed unless approved plans indicate otherwise.

 