The Project includes new construction of one five-story residential structure, containing a total of 40 condominium units ranging from 1,233 to 2,100 square feet in size and a total of 47 subterranean parking spaces. The project proposes 35 two-bedroom units, 5 three-bedroom units and approximately 22,884 square feet of combined common and private open space. The site will be accessed from a two-way driveway from South Mariposa Street. This application proposes to amend the 30-unit, five-story multifamily Project that was submitted as a part of the Notice of Intent application on December 26, 2023. 

The Project proposes to utilize AB1287 (Goverment Code Section 659159(v)) that allows a 100% density bonus for projects that include 15% "Very-Low" Income units and 15% "Moderate" Income units. The Project proposes three "Very-Low" Income units and three "Moderate" Income units and therefore proposes a total of 40 residential units. 

The Project site is approximately 1.01 acres (43,689 square feet), however the proposed scope of work includes dedication along the site's South Mariposa Street frontage, reducing the developable area to 36,525 square feet. The Project site is located near the intersection of Riverside Drive and South Mariposa Street adjacent to a residential neighborhood to the west and commercial uses to north, south, and east. 

ADDRESS: 
910 South Mariposa Street Burbank, CA 91505 (The Project site is located near the intersection of Morningside Drive and South Mariposa Street adjacent to a residential neighborhood to the west and commercial uses to the north, south, and east).
On October 4, 2024, Staff received an updated submittal package in response to the incomplete letter sent on July 1, 2024. Staff is currently reviewing the application to determine if the application is complete and to determine if the application is consistent with the City’s objective standards.
 

The City of Burbank entered into Enforceable Agreements with two Native American Tribes - the Gabrieleño Band of Mission Indians - Kizh Nation and the Fernandeño Tataviam Band of Mission Indians during the Project's Notice of Intent (NOI) stage. As part of the Formal Submission, City staff received an amended application to the Project on May 10, 2024. On May 28, 2024, City staff informed the two Native American Tribes of the Applicant's proposal to amend the application. A copy of the letters sent to each Tribe can be found below. Pursuant to Government Code Section 65913.4(b)(2)(E), the City is required to notify the Tribes of the proposed changes to the Project as well as their right, under the law, to request a subsequent scoping consultation. In an email correspondence to the Project Planner, the Gabrieleño Band of Mission Indians - Kizh Nation declined to update the signed enforceable agreement and indicated their intention to allow the Project to proceed under the previous enforceable agreement signed during the NOI stage. The Fernandeño Tataviam Band of Mission Indians indicated their desire to update the previously signed enforceable agreement and include the amended Project description. A copy of the updated signed enforceable agreement is below. 